Assembly set for the construction of a 90° bend in a screed-flush duct.
data sheet Continously hot galvanized (Sendzimir process) (DIN EN 10346)
| weight | |||
|---|---|---|---|
| UEBSMB 20S | 0,34 kg | ||
| UEBSMB 30S | 0,45 kg | ||
| UEBSMB 40S | 0,56 kg | ||
| UEBSMB 50S | 0,73 kg |
Assembly set for the construction of a 90° bend in a screed-flush duct.
data sheet| weight | |||
|---|---|---|---|
| UEBSMB 20S | 0,34 kg | ||
| UEBSMB 30S | 0,45 kg | ||
| UEBSMB 40S | 0,56 kg | ||
| UEBSMB 50S | 0,73 kg |